Over two years ago the uprights were cut out using templates made to from scale drawings. As the geometry of the bridge has since changed we had to revisit the timbers and make adjustments. This included cutting out toe sections which were to be glued to the foot of the uprights. All the timber used was air-dried.
Monday, 25 August 2008
Preparation of Balustrade Uprights
Over two years ago the uprights were cut out using templates made to from scale drawings. As the geometry of the bridge has since changed we had to revisit the timbers and make adjustments. This included cutting out toe sections which were to be glued to the foot of the uprights. All the timber used was air-dried.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment